lad2018

14/06/2018

10:04 pm

#21

lad2018

18 Feb 2018

26

Junior Member

Re: Celebration Homes Build

21

Jun 14, 2018 10:04 pm

looking forward to seeing the breakdown of extras so I have an idea before I get to pre-start.

thanks

Reply


Reply

Like

Share

More

lisalula

11/07/2018

11:05 am

#22

lisalula

23 Sep 2014

15

WA

Junior Member

Re: Celebration Homes Build

22

Jul 11, 2018 11:05 am

Finally getting to this....

So here's a breakdown of our prestart costs


  • $220 - transluent glazing to front door (we're having an aluminium glass front door)
  • Manhole to grarage
  • Moved AC return air so it wasn't in the middle of the lounge doorway in our hallway
  • Relocated ensuite shower mixer to side wall
  • $675 - Replaced 2 door cupboard in ensuite with bank of 3 drawers
  • Delete soap holder
  • 500w broom section in laundry
  • Flip laundry sink and washing machine location
  • $1556 - wall oven stack
  • $540 - single door laminated cupboard between wall oven stack and fridge
  • -$1675 - credit for westinghouse oven supply & install
  • -$710 - credit for westinghouse hotplate supply & install
  • $934 - 3 phase power for induction cooktop
  • -$685 - credit for deleted overhead cupboard (where window in kitchen is)
  • $700 - 10x double GPOs
  • $72 - 1x 2 way switch (hallway light)
  • $90 - 1x dimmer (theatre)
  • $80 - 2x junction box for future lights (kitchen & master bedroom)
  • $165 - 3x conduits (theatre for future speakers, hallway for future alarm and games for future TV)
  • -$630 - 14x bayonet light credits
  • $1500 - (25x LED lights)
  • $2,025 - 3x pot drawers in kitchen
  • $150 - cold water tap to fridge location
  • $250 - contrasting laminate colour (as we are having 2 different laminate colours)
  • No handles to overhead cupboards
  • $210 - DGPO to kitchen island

We had $2k credit from celebrations to start, so it only came in just over $3k.

We also had our block 12.5 BAL rated, as bush that is meant to be cleared for future blocks is still sitting there Celebration Homes Build (5) which means a further $4,900 variation.

And great news - WE HAVE NOW SETTLED! Just waiting on our building permit to come through and then it will be slab down!

Reply


Reply

Like

Share

More

lad2018

16/07/2018

5:07 pm

#23

lad2018

18 Feb 2018

26

Junior Member

Re: Celebration Homes Build

23

Jul 16, 2018 5:07 pm

thanks

we've had pre start also but had some unexpected drafting issues so back to council.

Sounds like you should be getting a slab soon Celebration Homes Build (8)

Reply


Reply

Like

Share

More

lad2018

17/07/2018

1:53 pm

#24

lad2018

18 Feb 2018

26

Junior Member

Re: Celebration Homes Build

24

Jul 17, 2018 1:53 pm

Prateek,

You send a link to your tiling thread in every reply you make, are you trying to drum up business or give advice?

Reply


Reply

Like

Share

More

Trotdeglobe

25/04/2019

1:07 pm

#25

Trotdeglobe

11 Mar 2019

7

Junior Member

Re: Celebration Homes Build

25

Apr 25, 2019 1:07 pm

Celebration Homes Build (13) lisalula

Finally getting to this....

So here's a breakdown of our prestart costs


  • $220 - transluent glazing to front door (we're having an aluminium glass front door)
  • Manhole to grarage
  • Moved AC return air so it wasn't in the middle of the lounge doorway in our hallway
  • Relocated ensuite shower mixer to side wall
  • $675 - Replaced 2 door cupboard in ensuite with bank of 3 drawers
  • Delete soap holder
  • 500w broom section in laundry
  • Flip laundry sink and washing machine location
  • $1556 - wall oven stack
  • $540 - single door laminated cupboard between wall oven stack and fridge
  • -$1675 - credit for westinghouse oven supply & install
  • -$710 - credit for westinghouse hotplate supply & install
  • $934 - 3 phase power for induction cooktop
  • -$685 - credit for deleted overhead cupboard (where window in kitchen is)
  • $700 - 10x double GPOs
  • $72 - 1x 2 way switch (hallway light)
  • $90 - 1x dimmer (theatre)
  • $80 - 2x junction box for future lights (kitchen & master bedroom)
  • $165 - 3x conduits (theatre for future speakers, hallway for future alarm and games for future TV)
  • -$630 - 14x bayonet light credits
  • $1500 - (25x LED lights)
  • $2,025 - 3x pot drawers in kitchen
  • $150 - cold water tap to fridge location
  • $250 - contrasting laminate colour (as we are having 2 different laminate colours)
  • No handles to overhead cupboards
  • $210 - DGPO to kitchen island

We had $2k credit from celebrations to start, so it only came in just over $3k.

We also had our block 12.5 BAL rated, as bush that is meant to be cleared for future blocks is still sitting there Celebration Homes Build (14) which means a further $4,900 variation.

And great news - WE HAVE NOW SETTLED! Just waiting on our building permit to come through and then it will be slab down!

Hi there,

Just wondering how your build went. Have you moved in ?
We have built the mirror image of the franklin i.e. The Crawford ...
Was wondering if you find the house to be a bit dark ?
We realized after moving in that the living areas are a bit dark, a bit disappointing but just wondering if you feel the same and if you have any suggestions ? Thanks in advance Celebration Homes Build (15)

Reply


Reply

Like

Share

More

lisalula

25/04/2019

1:34 pm

#26

lisalula

23 Sep 2014

15

WA

Junior Member

Re: Celebration Homes Build

26

Apr 25, 2019 1:34 pm

Celebration Homes Build (18) Trotdeglobe

Celebration Homes Build (19) lisalula

Finally getting to this....

So here's a breakdown of our prestart costs


  • $220 - transluent glazing to front door (we're having an aluminium glass front door)
  • Manhole to grarage
  • Moved AC return air so it wasn't in the middle of the lounge doorway in our hallway
  • Relocated ensuite shower mixer to side wall
  • $675 - Replaced 2 door cupboard in ensuite with bank of 3 drawers
  • Delete soap holder
  • 500w broom section in laundry
  • Flip laundry sink and washing machine location
  • $1556 - wall oven stack
  • $540 - single door laminated cupboard between wall oven stack and fridge
  • -$1675 - credit for westinghouse oven supply & install
  • -$710 - credit for westinghouse hotplate supply & install
  • $934 - 3 phase power for induction cooktop
  • -$685 - credit for deleted overhead cupboard (where window in kitchen is)
  • $700 - 10x double GPOs
  • $72 - 1x 2 way switch (hallway light)
  • $90 - 1x dimmer (theatre)
  • $80 - 2x junction box for future lights (kitchen & master bedroom)
  • $165 - 3x conduits (theatre for future speakers, hallway for future alarm and games for future TV)
  • -$630 - 14x bayonet light credits
  • $1500 - (25x LED lights)
  • $2,025 - 3x pot drawers in kitchen
  • $150 - cold water tap to fridge location
  • $250 - contrasting laminate colour (as we are having 2 different laminate colours)
  • No handles to overhead cupboards
  • $210 - DGPO to kitchen island

We had $2k credit from celebrations to start, so it only came in just over $3k.

We also had our block 12.5 BAL rated, as bush that is meant to be cleared for future blocks is still sitting there Celebration Homes Build (20) which means a further $4,900 variation.

And great news - WE HAVE NOW SETTLED! Just waiting on our building permit to come through and then it will be slab down!

Hi there,

Just wondering how your build went. Have you moved in ?
We have built the mirror image of the franklin i.e. The Crawford ...
Was wondering if you find the house to be a bit dark ?
We realized after moving in that the living areas are a bit dark, a bit disappointing but just wondering if you feel the same and if you have any suggestions ? Thanks in advance Celebration Homes Build (21)

Hey, yea all finished and moved in. It went ok, we had a number of issues with our build, one that may be applicable to you is the tiled pillar at the front, they built it larger than the plan but within tolerance and so it required 2 tiles rather than one and looked terrible, so we asked them to remove it and they did this begrudgingly and we had to pick a new, bigger tile. We also had issues with the tiling fall, which I’m still not really happy with as water doesn’t drain towards the overflow drains. I know what you mean about the house seeming dark but it’s actually quite light and open, although we haven’t yet installed our room divider between lounge and games so that might make it slightly darker (assuming Crawford is exactly the same as the franklin). We have all Led lights in the living, dining, games, kitchen area so that helps too, I think that was standard though when we signed up. Another issue is how long the kitchen tap takes to heat up... it takes so long, constantly wasting water or just end up boiling the kettle when needing hot water, we are going to look into why it takes so long, might just be an issue with our house. Best thing we did was hired our own building inspector for incremental inspections which kept the builder in check and there were a number of things picked up on that we wouldn’t have noticed, we used PCM Concepts, the guy was good but he misquoted is at the start and it ended a bit nasty, we still never heard back from him. Doors are also a bit rubbish as they rattle in the wind, I’ve had to put a few of those little gel dots (2 on top of each other) to stop the door from banging on the frame when they’re closed, we will be following this up. We had issues with our flyscreens all being installed damaged, our servery window was installed with a bar in the centre, which they had to fix, we installed our own ovens after handover and they wiring was done incorrectly and the holes for the ovens were the wrong size. There’s probably more that I can’t remember (or have buried deep in my mind haha). Where are you building? Are you building the standard plan or have you made changes? I had the intention of keeping this post up to date but ended up getting pregnant and it got moved down the priority list! 😂With the issues we had, Celebrations would initially shrug us off so we had to persevere to get items rectified, which was a total pain and made it all the more unenjoyable, fighting for what you paid for at every turn.

Reply


Reply

Like

Share

More

Trotdeglobe

25/04/2019

5:37 pm

#27

Trotdeglobe

11 Mar 2019

7

Junior Member

Re: Celebration Homes Build

27

Apr 25, 2019 5:37 pm

Celebration Homes Build (24) lisalula

Celebration Homes Build (25) Trotdeglobe

Celebration Homes Build (26) lisalula

Finally getting to this....

So here's a breakdown of our prestart costs


  • $220 - transluent glazing to front door (we're having an aluminium glass front door)
  • Manhole to grarage
  • Moved AC return air so it wasn't in the middle of the lounge doorway in our hallway
  • Relocated ensuite shower mixer to side wall
  • $675 - Replaced 2 door cupboard in ensuite with bank of 3 drawers
  • Delete soap holder
  • 500w broom section in laundry
  • Flip laundry sink and washing machine location
  • $1556 - wall oven stack
  • $540 - single door laminated cupboard between wall oven stack and fridge
  • -$1675 - credit for westinghouse oven supply & install
  • -$710 - credit for westinghouse hotplate supply & install
  • $934 - 3 phase power for induction cooktop
  • -$685 - credit for deleted overhead cupboard (where window in kitchen is)
  • $700 - 10x double GPOs
  • $72 - 1x 2 way switch (hallway light)
  • $90 - 1x dimmer (theatre)
  • $80 - 2x junction box for future lights (kitchen & master bedroom)
  • $165 - 3x conduits (theatre for future speakers, hallway for future alarm and games for future TV)
  • -$630 - 14x bayonet light credits
  • $1500 - (25x LED lights)
  • $2,025 - 3x pot drawers in kitchen
  • $150 - cold water tap to fridge location
  • $250 - contrasting laminate colour (as we are having 2 different laminate colours)
  • No handles to overhead cupboards
  • $210 - DGPO to kitchen island

We had $2k credit from celebrations to start, so it only came in just over $3k.

We also had our block 12.5 BAL rated, as bush that is meant to be cleared for future blocks is still sitting there Celebration Homes Build (27) which means a further $4,900 variation.

And great news - WE HAVE NOW SETTLED! Just waiting on our building permit to come through and then it will be slab down!

Hi there,

Just wondering how your build went. Have you moved in ?
We have built the mirror image of the franklin i.e. The Crawford ...
Was wondering if you find the house to be a bit dark ?
We realized after moving in that the living areas are a bit dark, a bit disappointing but just wondering if you feel the same and if you have any suggestions ? Thanks in advance Celebration Homes Build (28)

Hey, yea all finished and moved in. It went ok, we had a number of issues with our build, one that may be applicable to you is the tiled pillar at the front, they built it larger than the plan but within tolerance and so it required 2 tiles rather than one and looked terrible, so we asked them to remove it and they did this begrudgingly and we had to pick a new, bigger tile. We also had issues with the tiling fall, which I’m still not really happy with as water doesn’t drain towards the overflow drains. I know what you mean about the house seeming dark but it’s actually quite light and open, although we haven’t yet installed our room divider between lounge and games so that might make it slightly darker (assuming Crawford is exactly the same as the franklin). We have all Led lights in the living, dining, games, kitchen area so that helps too, I think that was standard though when we signed up. Another issue is how long the kitchen tap takes to heat up... it takes so long, constantly wasting water or just end up boiling the kettle when needing hot water, we are going to look into why it takes so long, might just be an issue with our house. Best thing we did was hired our own building inspector for incremental inspections which kept the builder in check and there were a number of things picked up on that we wouldn’t have noticed, we used PCM Concepts, the guy was good but he misquoted is at the start and it ended a bit nasty, we still never heard back from him. Doors are also a bit rubbish as they rattle in the wind, I’ve had to put a few of those little gel dots (2 on top of each other) to stop the door from banging on the frame when they’re closed, we will be following this up. We had issues with our flyscreens all being installed damaged, our servery window was installed with a bar in the centre, which they had to fix, we installed our own ovens after handover and they wiring was done incorrectly and the holes for the ovens were the wrong size. There’s probably more that I can’t remember (or have buried deep in my mind haha). Where are you building? Are you building the standard plan or have you made changes? I had the intention of keeping this post up to date but ended up getting pregnant and it got moved down the priority list! 😂With the issues we had, Celebrations would initially shrug us off so we had to persevere to get items rectified, which was a total pain and made it all the more unenjoyable, fighting for what you paid for at every turn.

Hi there,

Firstly congrats on the pregnancy. I hope alls going well on that front with you.
I think our situation was quite similar, I'm expecting my little one end next week so I totally understand the stress of building and being pregnant at the same time.
We had hired a building inspector too ( thankfully ) and he did pick up on a number of issues. All these glorious reviews we see on product review - I'm thinking to myself I just wish they have the common sense to have their build cross checked.

Yes the Crawford is exactly the same as the franklin. We have made a few changes, I've attached my floor plan. I've swapped the cinema with the masterbedroom and we are currently using it as a kids room + nursery.

Because of this change the Sq mt of our house increased and they conveniently pushed our house back thereby reducing our garden.
Pushing it upfront was not allowed by the council but they just ignored to tell us that ( so frustrating when you want that space for kids)

To accommodate the powder room they reduced the size of the cinema room instead of the small rooms out back again something we didn't realize assuming that the final plans were as decided earlier.
(Its not good to be too trusting in today's world)

With regards to the rooms being dark I think it's how the plot is oriented, maybe your living area are facing north or west, ours face SW AND S so a bit more darker I guess. And of course we have the half wall installed already which I agree blocks part of the light, but also hides my kids mess 😂
Now we are thinking of investing in skylights, but after summer sets in to just be sure if this darkness is not winter induced.

We have the issue with the rattling door too in the cinema and we will be bringing it up with them.

We choose to go with the Rheem storage water system, precisely because of the water taking too long to heat in our rental. We don't seem to have that problem thankfully with this system.

I agree with the part that they were very reluctant to make changes as per the building codes and even had the audacity to tell us celebration does it differently. I told them that if they don't want to follow the standards by the NCC then it's ok but we need it in writing.

From chipped face bricks, cracked bricks on internal walls, bathroom two being retiled it was not the best experience.
I didn't enjoy the build and it stressed out my pregnancy too.

I suggest you keep a list of all the issues, will come handy later at the 1 yr mark when they come in for maintenance.

I wish you luck with everything and I'll touch base with you and hope you do the same if you have any concerns.

LikeAdd a commentPin to Ideaboard

Reply


Sign in or Join to reply to this Topic

End

First2 of 2Last

Sort Newest

Go to page Previous1, 2

Sign in or Join to reply to this Topic

Tags Celebration HomesFranklinCalleyaWestern Australia

Page 2 of 2⋅27 posts

Celebration Homes Build (29)
I understand and agree to the TERMS OF USE and agree that this post satisfies these rules.

See all tagged discussions about Celebration Homes



Related

RelatedBuilding A New House

suku18

Celebration Homes Build (30)

21/02/2024

7

Fixed Price build Contract Vs Project management buildFixed Price build Contract Vs Project management build

Building A New House

Thank you so much everyone. This all makes a lot of sense. I guess when you talk to a builder who butters up everything to look very polished, you get to start believing…

suku18

7

21263

suku18

Feb 21, 2024 11:47 am

Watch

beesa888

Celebration Homes Build (31)

10/04/2024

3

Build experience - Trend Connection HomesBuild experience - Trend Connection Homes

Building A New House

How has your experience been like so far?

Arm256

3

52246

beesa888

Apr 10, 2024 12:04 am

Watch

Atmarsdenpark

Celebration Homes Build (32)

14/12/2023

14

So many builders going bust, how's King homes/Fowler homes?So many builders going bust, how's King homes/Fowler homes?

Building A New House

I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with…

akuma69

14

111227

Atmarsdenpark

Dec 14, 2023 10:41 pm

Watch

NKVA24

Celebration Homes Build (33)

10/03/2024

New Homes - Arli HomesNew Homes - Arli Homes

Building A New House

Hi there!Putting the feelers out there for those who have (or almost) built with Arli homes!Interested in your experiences who've built from their stock home designs…

NKVA24

27264

NKVA24

Mar 10, 2024 5:58 pm

Watch

hammerthis

Celebration Homes Build (34)

20/07/2023

1

Building Site Access - Victoria - New BuildBuilding Site Access - Victoria - New Build

General Discussion

For reference, this is the Austlii reference. My take on this is, that they would be breaking the law denying access to a homeowner in Victoria, or their agent from having…

hammerthis

1

10577

hammerthis

Jul 20, 2023 12:07 pm

Watch

Tags Celebration HomesFranklinCalleyaWestern Australia

You are here

Building ForumBuilding A New House

Browsing this forum

Bing [Bot], Google Adsense [Bot], Google Feedfetcher, Majestic-12 [Bot] and 450 guests

Celebration Homes Build (2024)

References

Top Articles
Latest Posts
Article information

Author: Cheryll Lueilwitz

Last Updated:

Views: 6538

Rating: 4.3 / 5 (54 voted)

Reviews: 85% of readers found this page helpful

Author information

Name: Cheryll Lueilwitz

Birthday: 1997-12-23

Address: 4653 O'Kon Hill, Lake Juanstad, AR 65469

Phone: +494124489301

Job: Marketing Representative

Hobby: Reading, Ice skating, Foraging, BASE jumping, Hiking, Skateboarding, Kayaking

Introduction: My name is Cheryll Lueilwitz, I am a sparkling, clean, super, lucky, joyous, outstanding, lucky person who loves writing and wants to share my knowledge and understanding with you.